- Nama Proyek
- Arthatel [Damkar SGA]
- Deskripsi
-
2023.
PABX & AP
PABX PANASONIC KX TES 824 3PTT 8 EXTENTION 1 UNIT TERMINAL BOX TELEPON KAPASITAS 20 PAIR 1 UNIT FACEPLATE DATA 2 PORT 3 PCS MODULAR TELEPON AMP 3 PCS OUTBOW DOS 3 PCS PESAWAT TELEPON ANALOG PANASONIC KX-T2371 2 PCS KABEL UTP CAT 6 1 DOZ KABEL UTP CAT 5 1 DOZ KABEL FO DROP CORE 2 CORE 150 M FACE PLATE FO 2 CORE + AKSESORIES SC 2 PCS PATCH CORD SC/UPC - SC/APC SM DUPLEX 2M 1 PCS PATCH CORD SC/UPC - SC/UPC SM DUPLEX 2M 1 PCS PIPA CONDUIT 20MM PUTIH 120 BTG SOK PIPA CONDUIT 20MM PUTIH 150 PCS KLEM PIPA CONDUIT 20MM 200 PCS FLEKSIBEL CONDUIT 20MM 1 ROLL Kabel duct 50 x 50 MM PANJANG 3 M 2 BTG KABEL DUCT CURVA 10 x 35MM 5 M Kabel duct TC 4 20 BTG AKSESORIES (KABEL TIES, FISHER & SEKRUP S6 RJ 45 DLL) 1 LOT
- Tgl Mulai
- May 22, 2023
- Tgl Akhir
- May 28, 2023
- Status
- Done
- Project Manager
-
PM1 .
Pekerja
List Kerja
| # | Pekerjaan | Deskripsi | Status | Action |
|---|---|---|---|---|
| 1 | 0. Survey |
|
Done | |
| 2 | A. Instalasi Kabel UTP CAT 6 | 3 titik ke AP (internet) |
Done | |
| 3 | B. Instalasi Kabel UTP CAT 5 | 8 titik ke telepon |
Done | |
| 4 | C. Instalasi Kabel FO Dropcore | backbone internet sudah selesai |
Done | |
| 5 | D. Instalasi Backbone Telepone | 1 titik |
Done | |
| 6 | E. Patching PABX & Setting |
|
Done | |
| 7 | F. Splacing FO & Comitioning | 4 core |
Done | |
| 8 | G. Pemasangan Access Point | 3 titik AP |
Done | |
| 9 | H. Testing & Comitioning |
|
Done | |
| 10 | I. Mobilisasi |
|
Done |
Catatan Pekerja